Make Good Warehouse Solutions (MGWS Group) is proud to announce the successful refurbishment and handover of 24 Lancaster Street, Ingleburn, to World Wire Cables Pty Ltd.
This project involved a comprehensive restoration of the 5,168 m² site to a premium industrial standard.
Exterior works included extensive concrete kerb and drive slab patching, boundary fence and gate repairs, landscaping, and a full two-coat repaint of all concrete panels, bollards, and handrails.
Internally, the facility underwent a deep warehouse scrub, washdown of metal-clad walls, and specialized slab repairs—including resin-filling expansion joints and core-drilling old dynabolt holes.
The office and foyer areas were modernized with new carpeting, retreated timber entry stairs, and a complete internal repaint of all walls, doors, and doorframes.
From replacing damaged metal cladding and downpipes to critical infrastructure upgrades like the main switchboard replacement and 100% lighting compliance, MGWS has delivered a high-quality, move-in-ready facility.
Scope Delivered by MGWS
• Exterior: Repaired concrete kerbs, drive slabs, and front gates; straightened boundary fencing; and applied a 2-coat paint system to all panels, bollards, and directional signage.
• Warehouse: Full floor pressure scrub, resin-filled all concrete expansion joints, core-drilled dynabolts, and epoxy-coated storeroom floors.
• Offices & Amenities: New carpet installation, timber stair retreating, secured office handrails, and replacement of damaged ceiling tiles.
• Infrastructure & Electrical: Successful replacement of the main warehouse switchboard, removal of redundant data cabling, and 100% lighting and safety compliance site-wide.
• Maintenance: Replaced damaged external metal cladding, downpipes, and flashing to ensure the facility was handed over in "as new" condition.